CFA piling is particularly suited to piling through interbedded sequences of clays and water bearing non-cohesive strata. A CFA pile is formed using a long string of augers, with soil displaced via the auger flights. Piles can be drilled to depths of up to 34m with the concrete pumped through the hollow stem of the augers as they are withdrawn from the design depth. Reinforcement cages are installed immediately after concreting.
Applications
Capability